Step 7 of 7 · Around days 40, 70 and 100

Proof

Is it working?

You execute. Then, at roughly day 40, 70 and 100, the plan faces its numbers. The agendas are set on day 10 so they cannot be dodged later.

Why this step exists

Around week six every plan turns into a story unless something measurable is keeping it honest. Deep fixes are invisible while they are happening, and invisible work loses support. The plan needs a pulse everyone can see moving, and a room that looks at numbers before anyone narrates.

What you leave with

The usual miss

Letting the review become a progress narrative, rescheduling when the numbers look bad, or omitting the flat vitals so the table can tell a kinder story.

3 tools

Tool 30 of 32

Checkpoint Review

The plan faces its numbers at three set points, on agendas fixed on day 10 so they cannot be dodged later.

At roughly day 40, 70 and 100, on agendas set in writing on day 10, in a fixed order that starts with numbers.

Open Checkpoint Review

Tool 31 of 32

Baseline Re-Measure

Every baseline number re-run the same way and shown next to today's, including the flat ones, because omission is the misuse this tool exists to prevent.

Inside each Checkpoint Review, against the vitals captured during the diagnosis window, same source, same method.

Open Baseline Re-Measure

Tool 32 of 32

Ledger Read-Back

The due forecasts read out next to what actually happened, because the gaps are the fastest way to learn what the plan got right.

Inside each Checkpoint Review, after the re-measure, read by a neutral person, never by the forecaster.

Open Ledger Read-Back